Detailed instructions for the crushing of construction waste processing equipment

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

Detailed instructions for the crushing of construction waste processing equipment

xuanxuan

In the crushing operation of construction waste crusher, the crushing process is the first step in the construction waste disposal operation. The normal stability of this process directly affects the follow-up work of construction waste. The construction waste treatment equipment and test sieve are the second part of the closed circuit, which can guarantee the product's particle size requirements without affecting the grinding operation.
The construction waste crushing process generally includes the construction waste screening operation, and the total of the broken parts constitutes a broken replacement surface flow. Generally used in the smashing process is two-stage or three-stage crushing. The two stages of the crushing process are divided into two sections, open and closed. The crushing granularity of construction waste treatment equipment products must meet the requirements of users, and at the same time as meeting the requirements, it can ensure that the normal operation of the machine is not affected.
In the construction waste treatment production process, the crushing stage is the first stage, according to different types of waste treatment, and different crushed particle sizes. In the process of crushing construction waste disposal equipment, in general, the crushing of building waste crusher is broken by primary. In the two stages of crushing process, most of the waste disposal processes are closed-circuit processes. Segments are produced from construction waste crusher and screen cables.
The construction waste crusher is mainly classified and broken in two parts. During the crushing process, the ore is bulky and it is impossible to crush it to the desired fineness, and it must be segmented. The secondary process is only applicable to the mining of small ore, the total reduction ratio is not large, the number of broken ore is not large, generally less than 1 kiloton per day.
In the process of processing, because the last stage of garbage disposal is open, the requirements for the granularity of broken products are often used in large-scale garbage disposal, in which objects with relatively high moisture content are treated, and when the materials are processed, the construction waste treatment equipment is still used. Plays an important role.